• WHEELABRATOR FALLS INC.

    Located in Falls Township, Bucks County, Pennsylvania, the Wheelabrator Falls waste-to-energy facility provides dependable, environmentally safe disposal of municipal solid waste for the Bucks County Area, while generating clean, renewable electricity for sale to the local utility. Owned and operated by Wheelabrator, Wheelabrator Falls processes up to 1,500 tons per day of municipal solid waste. Wheelabrator has an electric generating capacity of 53,000 kilowatts; the equivalent of supplying the electrical needs of 60,000 Pennsylvania homes.

    Wheelabrator Falls is also America’s first commercial waste-to-energy facility with a first privately initiated, totally integrated Materials Recovery Facility (MRF). The communities of Bucks County send their recyclables and non-recyclable trash to the same location. This instantly translates into substantial collection savings and increased recycling rates for the county year-after-year. The MRF utilizes state-of-the-art technology for sorting and processing commingled recyclables and is capable of processing up to 200 tons per day of recyclables into clean, marketable secondary materials supplementing the county’s existing recycling program.

    GENERAL
    Area Served:
    Eastern Pennsylvania
    Type of Contract:
    own and operate
    Start-up: 1994
    RECYCLING
    Type of Service:
    Materials Recovery Facility (MRF)-
    200 tons per day:
    * Glass
    * Ferrous and non-ferrous metals
    * Newspapers, corrugated, other grades
    REFUSE COMBUSTION
    Type of System: Mass-burn, water wall boilers
    Boiler Operation: 24 hours per day, 7 days per week
    Process Lines: 2 @ 750 tons per day each
    Feed System: Overhead cranes with ram feeders
    Grate Design: Von Roll reciprocating grates
    Combustion Temperature: 2000°F+
    Waste Volume Reduction: 90%
    AIR QUALITY CONTROL
    Type of Equipment: Dry scrubbers, fabric filters, SNCR (NOx controls), carbon injection
    ENERGY PRODUCTION
    Type of Energy: Electric power
    Steam Flow to Turbine: 416,000 pounds per hour @ 1300 psig/930*F
    Electric Generating Capacity: 53 megawatts/60,000 homes
    Cooling System: Mechanical draft cooling tower

     

    « Return to Main Plant Page